000 01385nam a2200337 4500
041 0 0 _aeng
043 0 0 _ae-sp---
074 0 0 _a1051-H-41 (MF)
082 0 0 _a621.4834 ANA 2001
086 0 0 _aY 3.N 88:53/0194
090 0 0 _a621.4834 ANA 2001
245 0 0 _aAnalysis of inadvertent pressurizer spray valve opening real transient with RELAP5/MOD3.2
_cprepared by J. Blanco ... [et al.]
260 0 0 _aWashington DC
_bOffice of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission
_c[2001]
300 0 0 _axiii, 63 p.
_bill.
440 0 0 _aInternational agreement report
_vNUREG/IA-0194.
500 0 0 _a"January 2001."
500 0 0 _a"Prepared as part of the Agreement on Research Participation and Technical Exchange under the International Code Application and Maintenance Program (CAMP)."
500 0 0 _a"UNESA."
500 0 0 _aPaper version no longer available for sale by the Supt. of Docs.
500 0 0 _aShipping list no.: 2001-0224-M.
504 0 0 _aIncludes bibliographical references (p. 63)
513 0 0 _aTechnical.
650 0 0 _aPressurized water reactors
_xAccidents
_zSpain
700 1 0 _aBlanco, J.
700 1 0 _aRebollo, L.
710 2 0 _aU.S. Nuclear Regulatory Commission.
_bOffice of Nuclear Regulatory Research.
710 2 0 _aUnidad Elâectrica S.A.
999 _c19482
_d19482